Monday, 5 March 2012

Table of Contents

Acknowledgement


Abstract


1.Introduction.


     1.1.Aim and Objectives.

     1.2.Scope.

     1.3.Methodology.

     1.4.Structure of Dissertation.

2.Background.

3.Analysis.

4.Design.

     4.1.Application Architecture Design.

        4.1.1.Ozeki SMS Gateway.

    4.2.Database Architecture Design.

        4.2.1.Database Table: Active Mobile Numbers.

        4.2.2.Database Table : Home Current Status.

        4.2.3.Database Table : Ozeki Message In and Ozeki Message Out

   4.3.Electronic Circuit Design.

   4.4.Video Monitoring System Design.

5.Implementation.

6.Testing and Evaluation.

7.Conclusion.

8.References.

9.Appendixes.
  39

No comments:

Post a Comment